Golder Ranch Fire District / Fire and Life Safety Division / 1175 W. Magee Rd / Tucson, AZ, 85704 / Office: (520) 818-1027 / Inspection Request Hotline: 825-5959
"*" indicates required fields
• Construction Plans up to 20 pages - (First Includes new buildings, structures, towers, tanks) - $300.00
• Construction Plans **MORE** than 20 pages - (Second Includes new buildings, structures, towers, tanks) - $300.00 Fee + Hourly Rate
• Construction Plan Re-Submittals - (From Original Plan Sets) - $300.00
• Document Review for Items found on TOV 1.2 General Application Form **Pre-applications, Sprinkler Confirmations - No Charge** - (Includes General Plan, CUP Amendments, Zoning, Conceptual or Final sites, Plats) - $100.00
• Fire Code Consultation; Interpretations; Pre-submittals - (Includes initial meeting, research and document review) - Hourly Rate
• Technical Services; Review Documents and Reports - (Includes Research, Documentation/Report Review) - $150.00 Fee = Hourly Rate
• Tenant Improvements including building construction and interior remodels - (Modifications to Existing Buildings) - $300.00
• Expedited from 20 days to 10 days (Plan set no larger that 20 pages) - includes new buildings, structures, towers, tanks - $900.00
• Expedited from 20 days to 5 days (Plan set no larger than 20 pages) - Includes new buildings, structures, towers, tanks - $1500.00
• Expedited Same Day / Next Day (Plan set no larger than 20 pages) - $2100.00
• Aboveground Storage Tank (AST) (per Tank) - $300.00
• Access Gates (Installation or Modification) - $300.00
• Access Roadway - Fire Apparatus (New or Modification) - $300.00
• Compressed Gas Systems (per Permit) - $300.00
• Fire Alarm NFPA #72 Automatic / Manual System (New Installation per FACU) - $300.00
• Fire Alarm NFPA #72 Automatic / Manual System (Modification per FACU) - $150.00
• Fire Alarm NFPA #72 Monitoring System (per FACU) - $150.00
• Fire Suppression System (CO2; Halon; FR; Dry; Wet) (New Installation per System) - $300.00
• Fire Suppression System (CO2; Hallon; FR; Dry; Wet) (Modification per System) - $150.00
• Residential Fire Sprinkler Systems New Installations (per System Riser) - $200.00
• Residential Fire Sprinkler Systems Modifications to Existing (per System Riser) - $100.00
• Solar Photovoltaic Systems (per system) - $300.00
• Underground Storage Tank (UST) (per tank) - $300.00
• Water Supply - New Hydrant Installations with Flow Test (per Individual Hydrant) - $150.00
• Water Supply Improvements Including: New Subdivisions (per Water Improvement Plan) - $300.00
• Water Supply Mains Including: Sprinklers and Standpipe Feed Lines, Hydrant Lines, Main Extensions (per Main) - $150.00
• Blasting (per Job Site per 30 Day Period) - $300.00
• Burning: Commercial - (per Job Site per 30 Day Period) - $200.00
• Burning: Residential - (per Site per 6 Month Period) - $0.00
• Hot Work: Cutting/Grinding/Welding (Wildfire Risk Area) - $25.00
• Fireworks & Pyrotechnic Public Displays (per Display) - $250.00 **
• Hazardous Materials Use/Storage (per Site) - $300.00
• LP Gas Tanks or Systems: Commercial (per Tank or System) - $300.00
• LP Gas Tanks or Systems: Residential (per Tank or System) - $75.00
• Mobile Food Preparation Vehicles: Includes all Inspections (Annual Permit) - $25.00 *
• Special Use Permits (per Event) - $100.00 **
• Tent/Canopies/Membrane Structures (per Tent > 400 sq ft) - $150.00
• Other Operations per IFC (per Operation per Year) - $75.00